Test system PD Full Protocol Power Bank PD Fast Charging Discharge Test Adapter Power Testing Equipment
1. Enhance Testing Efficiency
- Automated Testing: The power bank testing system enables automated testing, reducing manual intervention and significantly improving testing efficiency. For example, in aging tests, the system can automatically monitor the charging and discharging processes, record data, and perform charge-discharge operations based on preset conditions without requiring constant supervision.
- Batch Testing: The system supports testing multiple power banks simultaneously, further enhancing testing efficiency.
2. Improve Testing Accuracy
- Precise Control: The power bank testing system can precisely control the charging and discharging processes, including parameters such as voltage, current, and power, ensuring the accuracy of test results. For instance, in battery capacity tests, the system can accurately measure the power consumption of the power bank under different load conditions.
- Data Acquisition and Processing: The system is capable of real-time data acquisition and advanced algorithmic processing and analysis, providing precise test outcomes.
3. Enhance Test Reliability
- High Stability: The power bank testing system boasts excellent stability, capable of long-duration stable operation to ensure the reliability of test results. For example, in cycle life tests, the system needs to conduct prolonged charge-discharge cycle testing on the power banks, where stability is crucial for ensuring the accuracy of test results.
- Fault Detection and Early Warning: The system can monitor the working status of the power bank in real time, promptly issuing warnings and halting tests upon detecting anomalies or faults, thus preventing damage to the power bank.
4. Simplify Testing Processes
- User-Friendly Interface: The power bank testing system is typically equipped with an intuitive user interface, enabling operators to easily set test parameters, initiate testing tasks, and view test results.
- Standardized Testing Procedures: The system conducts tests according to preset standards and procedures, ensuring consistency and repeatability in the testing process. This helps reduce the influence of human factors on test results.
5. Cost Savings
- Reduce Labor Costs: Through automated testing and batch testing capabilities, the power bank testing system can significantly reduce the required labor force, thereby lowering testing costs.
- Improve Product Quality: The system can accurately detect potential issues and defects in power banks, helping to enhance product quality and reduce the defective rate. This not only saves on return and repair costs but also boosts corporate reputation and market competitiveness.
Test Items of Top-Smart 1100 Mobile Power Supply Testing System:
Input test | Charge test |
Input voltage ramp | Charge current test |
Input freq. ramp | Full charge testing |
AC cycle drop out | slow charge test |
Input power supply distortion mode | Slow Charge ID setting test |
Input RMS current | Discharge while charge test |
input power | Electricity indication test |
Input power factor | Simulation battery function |
Input peak current test | Wireless charging test |
Output test | Timing / dynamic test |
DC output voltage | Turn ON time |
DC output current | Rise time |
Power up sequence | Fall time |
Power off sequence | Hold-up time |
Tracking | Special test |
Efficiency test | LED lamp voltage and status test |
Overshoot voltage test | LED flashing frequency test |
Peak-Peak noise | Sleep mode test |
Stability test | D + / D-voltage test |
Voltage regulation | MCU communication and calibration tests |
Current regulation | Discharge test |
Mixed effect test | GPIB read/write |
Protection test | USB read/write |
Short circuit test | RS232 read / write |
OV protection | TTL signal control |
UV protection | Relay control |
Charge protection test | Bar code scan |
Discharge protection test | Extended measurement function |
Overcurrent protection test | |
Fast charge test(Applicable to QC2.0, QC3.0 and other fast charge test) | |